The manufacturer of the roller shaped sand making machine explains the correct installation method of the dewatering screen

2024-09-25 10:37:00
times

  Dehydration sieve is a screening equipment commonly used in industries such as mining, building materials, and chemical engineering. It is mainly used to remove moisture from materials and improve their dryness. The correct installation method is crucial for the normal operation and service life of the equipment. Below, Anhui roller shaped sand making machine manufacturers will explain the correct installation method, steps, and precautions for dewatering screens.

  1. Preparation before installation

  Check the equipment: Before installation, inspect all components of the dewatering screen to ensure that there are no damaged or missing parts.

  Position determination: Choose a sturdy and flat foundation to avoid installing equipment on unstable ground and reduce the impact of vibration on the equipment.

  2. Installation foundation

  Infrastructure construction: Build a sufficiently sturdy foundation based on the size and weight of the equipment. The foundation generally needs to be poured with concrete to ensure its strength and stability.

  Horizontal inspection: Use a level to check the flatness of the foundation, ensuring that the foundation surface is level to prevent tilting during the operation of the dewatering screen.

  3. Install dehydration screen

  Positioning: Place the dewatering screen on the foundation to ensure proper connection with the feeding and conveying equipment. Usually, the feeding end should be higher than the drainage end so that moisture can flow out naturally.

  Fixed: Use bolts or other fixing devices to stabilize the dewatering screen on the foundation, ensuring that the equipment does not shift during operation.

  4. Connect the water source and power supply

  Water source connection: According to the requirements of the equipment, connect the water pipes to ensure sufficient water supply for the dehydration screen to work properly.

  Power connection: Connect the power supply correctly according to the electrical specifications of the device to ensure the safety and stability of the electrical system.

  5. Debugging and Testing

  No load operation: After installation, conduct a no-load test run to check the vibration and sound of the equipment to ensure that there are no abnormal conditions.

  Load testing: Gradually add materials and conduct load testing to observe the dehydration effect and whether various parameters are normal.

  6. Regular maintenance

  Regular inspection: Regularly inspect the dehydration screen, pay attention to the wear and tear of the equipment, and replace damaged parts in a timely manner.

  Cleaning and maintenance: Keep the equipment clean, regularly clean the screen surface and drainage pipes to avoid blockages.

  Conclusion

  Proper installation of dehydration screens is crucial for improving work efficiency and extending equipment lifespan. By following the above steps for installation and regular maintenance, the stability and reliability of the dewatering screen during operation can be ensured. Ensuring that operators understand installation and usage precautions can effectively improve production efficiency and reduce the occurrence of malfunctions.

Tags

Recently Viewed:

Related products

Related news

  • menu

Headquarters: Wuhu Weixiao Heavy Industry Co., Ltd

Branch: Linhai Weixiao; Shanghai Weixiao; Shenyang Weixiao; Guangzhou Weixiao

Mobile: 138-0656-1088 (Mr. Wu)

Mobile: 135-6642-6600 (Mr. Wu)

Mobile: 152-6721-1127 (Mr. Zhou)

Email: shwszg@foxmail.com

Address: Intersection of S460 Provincial Road and Longchi Road, Nanling County, Anhui Province